Here you can follow the construction progress from 2020 of the VIDO Project.
The floor slab is currently being concreted and the first walls in the basement are being erected.
The 1st crane for the building construction has been erected and the work on the base plate of the 2nd construction phase has begun.
The building pit of the underground car park has been excavated. The construction crane is erected.
Most of the shoring work has been completed. Advance excavation for placing the back anchoring is carried out.
Construction roads and working levels for the large equipment are laid out.
Preparatory measures of the site.